Portland was appointed to provide civil & structural design services for all elements of the development. The project redeveloped the site of a disused manufacturing base to provide a speculative industrial unit of 71,000ft2
A piled foundation and slab design was devised and a foundation risk assessment undertaken to address the challenges of piling in relation to the aquifer and the risk of the migration of contamination.
To ‘de-risk the piling operation, the existing building foundations were exposed and surveyed to allow the new building foundations to be positioned in locations away from where clashes could occur.
Due to the proximity of the river, the site lies within a Zone 3 flood zone and a sequential test was undertaken as part of our Flood Risk Assessment.
The development provides a 71,000ft2 unit with 12.5m to underside of haunch with a slab designed with a capacity of 50kN/m2 and FM2 flatness.
An extensive concrete yard serves the unit, with multiple loading docks.
The building is designed to achieve BREEAM Excellent requirements.