The project comprised a full ward refurbishment involving structural modifications to accommodate the new layout and works to improve infection control measures. A new mechanical ventilation system was installed which required air handling units located in the roof space and significant builder’s works for the new ductwork and other M&E items.
As part of the works, Portland were required to familiarise with the existing building and as part of the initial survey and opening up investigations it became clear the building had been the subject of previous alterations and structural modifications. This posed challenges in that previous structural alterations also needed upgrading to accommodate the changes in load paths crated by the new structural works.
A full understanding of the structural elements was required, both in terms of supporting vertical loads but also any contribution to horizontal stability, such as internal buttressing walls.
A significant element of the project was to provide side rooms each with an ensuite facility. Widespread alterations to the drainage were required and Portland were able to make suggestions in respect to the room layout that simplified the drainage works and reduce the magnitude of cuts to the internal slab.
The roof was a traditional timber construction and as such a full assessment was. Required to prove its capacity to support then new mechanical equipment and strengthening works to be designed.